  • PROJECT TITLE : Sterling Project
  • CLIENT : Shell Eastern Petroleum Pte Ltd
  • YEAR : 2022
  • PROJECT SCOPE : Electrical and Instrumentation works for SMPO-1 Second Stage Flash (SSF) & SMPO-2 Botton Stripper (BS)
  • PROJECT TITLE : EGS Cable Diversion Works
  • CLIENT : Air Liquide Singapore Private Limited
  • YEAR : 2021
  • PROJECT SCOPE : Instrument Installation and Integration Works
  • PROJECT TITLE : Seraya S1 TA 2021
  • CLIENT : Yokogawa Engineering Asia Pte Ltd
  • YEAR : 2021
  • PROJECT SCOPE : Removal of existing FCS cabinets,DCS notes, AUX panels, HIS stations and replacing with new system during Seraya S1 Turn Around
  • PROJECT TITLE : SSF2
  • CLIENT : Shell Eastern Petroleum Pte Ltd
  • YEAR : 2019
  • PROJECT SCOPE : Electrical and Instrumentation, Control system erection of new build Chemical process plant which tie in to existing Plant.
  • PROJECT TITLE : EGS REVAMP Project
  • CLIENT : Shell Eastern Petroleum
  • YEAR : 2018
  • PROJECT SCOPE : Demolition, relocation and new cable laying c/w termination works for electrical.
  • PROJECT TITLE : Temporary Facilities Project
  • CLIENT : NESTE OIL SINGAPORE PTE LTD
  • YEAR : 2017
  • PROJECT SCOPE : Design and build Electrical system for the new temporary facilities for NESTE Oil
  • PROJECT TITLE : BASF FF Formgiving & Packaging Project
  • CLIENT : BASF South East Asia Pte Ltd
  • YEAR : 2017
  • PROJECT SCOPE : Providing services towards E&I demolition works in existing plant and new installation work
  • PROJECT TITLE : Secondary Stage Flash & Bottom Stripper Project (SSF & BS)
  • CLIENT : Shell Chemicals Seraya Pte Ltd
  • YEAR : 2016
  • PROJECT SCOPE : Electrical and Instrumentation works sited in Shell Chemical Seraya on the existing S1 & S2 chemical complexes respectively.
  • PROJECT TITLE : Aurora EOS Project
  • CLIENT : Exxon Mobil
  • YEAR : 2016
  • PROJECT SCOPE : Perform Plant Electrical lighting installation works including cable ways, cable installation, cable glanding termination and Test for EOS Area and partly in AURORA Unit.
  • PROJECT TITLE : EOG 2 Ruby Feed Project
  • CLIENT : Shell Chemicals Seraya Pte Ltd
  • YEAR : 2016
  • PROJECT SCOPE : ELECTRICAL AND INSTRUMENT INSTALLATION WORKS
  • PROJECT TITLE : SARB- INJECTION COMPRESSOR TRAIN
  • CLIENT : LENG CHOONG ENGINEERING PTE LTD
  • YEAR : 2015
  • PROJECT SCOPE : Provision of manpower for installation of electrical & instrument integration on 1 x no. compressor skid including supply of ss cable trays
  • PROJECT TITLE : GREASE EPCm Project - E&I
  • CLIENT : Shell Chemicals Seraya Pte Ltd
  • YEAR : 2013
  • PROJECT SCOPE : ELECTRICAL AND INSTRUMENT INSTALLATION WORKS
  • PROJECT TITLE : LEO+SILVER PROJECT
  • CLIENT : Shell Eastern Petroleum
  • YEAR : 2013
  • PROJECT SCOPE : ELECTRICAL AND INSTRUMENT INSTALLATION WORKS in existing / new EGS & MEG plants.
  • PROJECT TITLE : GREASE EPCm PROJECT- E & I
  • CLIENT : SHELL CHEMICALS SERAYA PTE LTD
  • YEAR : 2013
  • PROJECT SCOPE : ELECTRICAL AND INSTRUMENT INSTALLATION WORKS
  • PROJECT TITLE : DPC Demo Unit Project - Module ISBL & OSBL Seraya
  • CLIENT : Shell Chemicals Seraya Pte Ltd
  • YEAR : 2012
  • PROJECT SCOPE : ELECTRICAL AND INSTRUMENT INSTALLATION WORKS
  • PROJECT TITLE : P28132 - Anti-Oxidant Dosing Facilities Tie-up of C23/2401
  • CLIENT : Shell Chemicals Seraya Pte Ltd
  • YEAR : 2011
  • PROJECT SCOPE : New Electrical and Iinstrument installation to be tie in into existing infrastructure.
  • PROJECT TITLE : Bukom Refinery SCOT / BUGIS Proj. Instrumentation Work Package A-1
  • CLIENT : Shell Eastern Petroleum
  • YEAR : 2011
  • PROJECT SCOPE : INSTRUMENT INSTALLATION AND INTEGRATION WORKS
  • PROJECT TITLE : Shell Chemicals Seraya CCB/AUX Rooms PLC Replacement Project
  • CLIENT : Shell Chemicals Seraya Pte Ltd
  • YEAR : 2010
  • PROJECT SCOPE : Installation of new panels in the control room and includes new cable to be installed and terminated.
  • PROJECT TITLE : Shell SEPC C2 Jetty & Interconnecting Pipeline Project
  • CLIENT : Shell Chemicals Seraya Pte Ltd
  • YEAR : 2008
  • PROJECT SCOPE : Excavation & electrical main cable laying and electrical installation works on the new pipeline project
  • PROJECT TITLE : Houdini Shell BRM Project
  • CLIENT : Shell Eastern Petroleum
  • YEAR : 2007
  • PROJECT SCOPE : Revamp work in Shell Hydro-cracker plant with shut down for tie-in and an installation work for a new SRU unit.